My husband had a interesting and busy day yesterday.
As I stated he chained up in the morning and it was slow going through the pass. Then he arrived at his drop in Spokane to find out that the load was on two different places on his trailer. The receiver in Spokane did not want to touch the product or move it over for the receiver in Post Falls because of liability reasons. So my husband dropped a portion of the load in Spokane then went to Post Falls to drop that load.
On the way back to Spokane he was pulled over at the scale heading into Washington :shock: He had a level three inspection and everything was up to date in his logs he said he passed it with flying colors.
Then he went back to his drop in Spokane to finish the drop. He picked up some railroad ties just down the road. He spent the night at the yard in Spokane at System Transport.
This morning he will be dropping in Umatilla Oregon. This will be around 170 miles plus the 20 miles to Spokane.
This Friday we will get our first check from System Transport
It has been a long time since our last check from Davis and we are welcoming it.
My temp agency is super slow right now and I am thinking about going to a few others to find some work to help things along!
Goin Fer It's Wife