User Tag List

Reply
 
LinkBack Thread Tools
  #1  
Old 04-30-2007, 03:38 AM
terrylamar's Avatar
Senior Board Member
Thread Starter
Join Date: Apr 2006
Location: Austin, TX
Posts: 1,567
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Default Storage in the Peterbilt 379

I'm a TMC Company Driver, I have a `2006 Peterbilt 379. I am looking for some storage options for the storage areas on either side of the sleeper. Idealy, I would like to put in two cabinet that have drawers or even shelves if there is some way to prevent items from falling out. How are you storing your cloths and other items in the 379?
__________________
Terry L. Davis
O/O with own authority
Reply With Quote
  #2  
Old 04-30-2007, 04:31 AM
golfhobo's Avatar
Board Icon
Join Date: Oct 2005
Location: the 19th hole / NC
Posts: 9,647
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Default

Aw... C'mon, T.L! You're just looking for a way to mount your gun rack! :lol:
__________________
Remember... friends are few and far between.

TRUCKIN' AIN'T FOR WUSSES!!!

"I am willing to admit that I was wrong." The Rev.
Reply With Quote
  #3  
Old 04-30-2007, 04:40 AM
terrylamar's Avatar
Senior Board Member
Thread Starter
Join Date: Apr 2006
Location: Austin, TX
Posts: 1,567
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Default

Quote:
Originally Posted by golfhobo
Aw... C'mon, T.L! You're just looking for a way to mount your gun rack! :lol:
No, I have already cut firing ports in the sides, I have a chaingun mounted on the front, M40 Gernade Launcher on the rear and Nuke capable mortars on the flatbed. 8)
__________________
Terry L. Davis
O/O with own authority
Reply With Quote
  #4  
Old 04-30-2007, 05:15 AM
golfhobo's Avatar
Board Icon
Join Date: Oct 2005
Location: the 19th hole / NC
Posts: 9,647
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Default

Quote:
Originally Posted by terrylamar
Quote:
Originally Posted by golfhobo
Aw... C'mon, T.L! You're just looking for a way to mount your gun rack! :lol:
No, I have already cut firing ports in the sides, I have a chaingun mounted on the front, M40 Gernade Launcher on the rear and Nuke capable mortars on the flatbed. 8)
Ah.... I got it. Then you're just looking for a way to secure your Golf Clubs and Whiskey, right? :wink:
__________________
Remember... friends are few and far between.

TRUCKIN' AIN'T FOR WUSSES!!!

"I am willing to admit that I was wrong." The Rev.
Reply With Quote
  #5  
Old 04-30-2007, 05:21 AM
terrylamar's Avatar
Senior Board Member
Thread Starter
Join Date: Apr 2006
Location: Austin, TX
Posts: 1,567
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Default

Quote:
Originally Posted by golfhobo
Quote:
Originally Posted by terrylamar
Quote:
Originally Posted by golfhobo
Aw... C'mon, T.L! You're just looking for a way to mount your gun rack! :lol:
No, I have already cut firing ports in the sides, I have a chaingun mounted on the front, M40 Gernade Launcher on the rear and Nuke capable mortars on the flatbed. 8)
Ah.... I got it. Then you're just looking for a way to secure your Golf Clubs and Whiskey, right? :wink:
Wrong again, I need the storage for my Rush Limbaugh iPods. Three hours per day adds up really quick! :lol:
__________________
Terry L. Davis
O/O with own authority
Reply With Quote
  #6  
Old 04-30-2007, 05:39 AM
golfhobo's Avatar
Board Icon
Join Date: Oct 2005
Location: the 19th hole / NC
Posts: 9,647
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Default

Well.... then..... why didn't you SAY you were looking for help from another Conservative???

I don't know what an Ipod IS.... and I've never HEARD of Russki Limburger!!! :shock:

Besides, I drive a Freightshaker, and they've allready figured out that little problem!
__________________
Remember... friends are few and far between.

TRUCKIN' AIN'T FOR WUSSES!!!

"I am willing to admit that I was wrong." The Rev.
Reply With Quote
  #7  
Old 04-30-2007, 01:55 PM
Jackrabbit379's Avatar
Board Icon
Join Date: Oct 2005
Location: Wichita Falls,Tx
Posts: 7,197
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Default

I used to drive a 359, when I was hauling grain. I had those long clear storage containers. The ones with the lids on top that snapped at the ends. I got them at Wal-Mart. I used to slide them under the bed. My buddy that has a 379, his driver uses the top bunk for his extra stuff.
__________________


http://watsonsysco.com/
Reply With Quote
  #8  
Old 04-30-2007, 08:07 PM
Roadhog's Avatar
Board Icon
Join Date: Sep 2005
Location: Tartuga .......me thinks
Posts: 9,867
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Mentioned: 0 Post(s)
Tagged: 1 Thread(s)
Default

Which sleeper?

I converted the cloths closet in mine. I never hang cloths up anyway. I made a shelf up about 16" off the floor. On top of that I have a nice little wooden drawer cabinet, with the slide-out table-top. You can buy these cabinets at the Peterbilt Dealership. On top of the wooden cabinet, I have my 12v cooler. On the other side I have three wooden shelves I made. That is where I store my laptop, briefcase, and all my cloths. My cloths are all folded up and stowed on the shelves. I used wafer-board with the rough finish...so stuff stays put...and not slide around.

Stop at the Peterbilt Store near you and check out the rigs on the lot for all the ideas, and if you see something you like..chances are you can buy it from them, make it yourself, or order it from them.

The new 389 has the BEST storage and layout of them all. You gotta check it out. They have over-head bunk storage cabinets I'm sure one could buy and retrofit an older 379.
Reply With Quote
Reply






Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 11:19 AM.


User Alert System provided by Advanced User Tagging v3.3.0 (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.