Quote:
Originally Posted by Mackman
What the ton rate for 35mi oneway. I only hjaul the hot stuff by the hour. So if there is a line at the plant or at the paver im getting paid. All my stone is by the ton.
Mackman, the haul is paying $9.50/ton and if we sit at the paver for more than 15min we get paid holding time of $35hr but, at the plant they don't pay any holding time. Also are truck avg. about 20tons to the load some more some less.