Trucker Forum - Trucking & Driving Forums - Class A Drivers

Trucker Forum - Trucking & Driving Forums - Class A Drivers (https://www.classadrivers.com/forum/)
-   Anything and Everything (https://www.classadrivers.com/forum/anything-everything-106/)
-   -   speed at time of impact was around 120 MPH (https://www.classadrivers.com/forum/anything-everything/26423-speed-time-impact-around-120-mph.html)

flood 04-19-2007 01:10 PM

speed at time of impact was around 120 MPH
 
http://www.kjrh.com/mostpopular/stor...6-9a7bfe122509 :shock: :shock:

bulldog2036 04-19-2007 01:15 PM

Good for him.

Sentinel 04-19-2007 01:36 PM

Glad to hear that segment of the human gene pool is thinning out without causing harm to others! :mrgreen:

fjkfta 04-19-2007 04:02 PM

as a biker and a trucker i think all of you who say good for him are a@#holes. do i condone that speed no but i do not wish harm on anyone. :sad: RIP biker

flood 04-19-2007 05:09 PM


Originally Posted by fjkfta
as a biker and a trucker i think all of you who say good for him are a@#holes. do i condone that speed no but i do not wish harm on anyone. :sad: RIP biker

well said i too do both

bulldog2036 04-20-2007 01:54 AM

No, the A-holes are those that put others lives in danger because they want to strap on to a vehicle that will go fast and will do so just to "test it out"... :roll: ....Yes, "RIP biker" :roll: :roll: ...good thing he is off the streets to do no damage to anyone else. Maybe that is where YOU should be since you condone this type of behavior. What, too callous for you? I tell it like it is.

Mackman 04-20-2007 01:39 PM


Originally Posted by bulldog2036
No, the A-holes are those that put others lives in danger because they want to strap on to a vehicle that will go fast and will do so just to "test it out"... :roll: ....Yes, "RIP biker" :roll: :roll: ...good thing he is off the streets to do no damage to anyone else. Maybe that is where YOU should be since you condone this type of behavior. What, too callous for you? I tell it like it is.

I agree and i am a biker. But i ride harleys which is a total diff. biker Them street bikes aint nothing but a@@holes. RIP i do hate to see this kinda of stuff. But he had no right to do even any where close to 120.

Sentinel 04-21-2007 01:25 AM


Originally Posted by fjkfta
as a biker and a trucker i think all of you who say good for him are a@#holes. do i condone that speed no but i do not wish harm on anyone. :sad: RIP biker

As a biker and a trucker I think all of you who say "good for him" are on the right track. I've been a biker for more years than I can count. There is ABSOLUTELY no reason for those speeds on public roadways!! There are plenty of places that individual could "Feed his need for speed" and still not place anyone else' life in danger. This same type of individual is an example of the ones that will fly through rush hour traffic, weaving in and out, create their own lane between vehicles, using the shoulder for driving, etc. I stand behind what I said am am glad the gene pool is being reduced without physically harming other innocent people.

And by the way, the idiot is not a biker! He was someone who could afford a fast bike and decided he had a new toy. A "Biker" understands the road, his machine and the general public around him. A "Biker", just like a "Trucker" is a professional with his machine! That idiot was neither a professional nor a biker!

Who I certainly feel for in this incident is the trucker himself. Although he may not have been physically harmed, there is no doubt that incident will forever be etched in his mind! Even though he was not the cause he will most likely always wonder if he did something to cause it or could have done something to prevent it. That is only normal for a decent human being. Unfortunately it has its toll mentally on decent human beings.

ben45750 04-21-2007 04:31 AM

"The trucker told officers the impact made him think he'd been hit by another truck."

Wow that would be a hard hit.

"The medical examiner will try to determine if White might have been intoxicated at the time."

Probably not much left to get a sample for the test

rcso 04-21-2007 05:58 AM


Originally Posted by ben45750
"The trucker told officers the impact made him think he'd been hit by another truck."

He must have never driven a tank lol :D


All times are GMT -12. The time now is 11:47 AM.


Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved